How it Works
THE K&K PROCESS GUIDE
K&K Construction & Investment's Corp Process
WORLD’S MOST ECONOMIC STEEL CONSTRUCTION PROCESS
Design

STEP 01
Design
When going modular, it is important to commit to your modular provider and their technology early in your project to maximize efficiencies. With K&K’s modular design assist program, we become an integral component to your consultant team and guide them through the design process of a steel frame modular project manufactured in Shanghai.
Supply Chain/ Procurement

STEP 02
Supply Chain/ Procurement
Value engineering is key to everything we do at K&K. Our procurement team will interface with our consultant group to guide the materials specified and sourced for each project. Our goal is to take advantage of our advanced Asia supply chain network to source cost effective and quality materials when possible, creating cost efficiencies for our clients.
Steel Frame Fabrication

STEP 03
Steel Frame Fabrication
K&K modules are custom assembled based upon the layout and structural requirements of every project. We work with one of the world’s largest and sophisticated steel manufacturers in the world to ensure our frames and light gauge steel infill walls are completed with laser precision every time. Our factory is CWB and AWS certified and our oversight is second to none.
Fit Out & Inspection

STEP 04
Fit Out & Inspection
Once module frames pass inspection, they move to the fit out stage. With all materials in inventory at the factory, installation moves fast when compared to conventional construction. Our QA/QC program is rigorous and each step of installation is checked and documented extensively. Our clients can typically expect over 1000 pages of documentation and images uploaded to the cloud for each modular unit produced for their project.
Delivery

STEP 05
Delivery
K&K’s in house logistics team sources cost effective shipping, trucking and rail options for delivery to our project sites. While the DMV Metro Area is our focus, we have shipped modules to DMV Metro Area destinations when the economics are justified. The entire process is managed in house to ensure a seamless delivery to site.
K&K & Finish

STEP 06
K&K & Finish
Upon arrival at site, building erection moves at a rapid pace with an average of 8 modules being placed per day. Bird Construction specializes in modular installation, but our group works with other qualified general contractors if required. Once set and waterproofed, our install teams will connect MEP systems, finish module seams and complete all exterior finishes on the building.
Occupancy Sooner

STEP 07
Occupancy Sooner
Occupancy can often be achieved 30%-50% faster than conventional construction processes. Our clients are sooner to revenue and onto the next project with their capital pool hard at work.